K-12 Education Archives - Swinerton https://swinerton.com/market/k-12-education/ Pride of Ownership. Peace of Mind. Tue, 28 Jan 2025 23:47:45 +0000 en-US hourly 1 https://wordpress.org/?v=6.7.1 Fountain Valley School Campus Improvements https://swinerton.com/project/fountain-valley-school-campus-improvements/ Tue, 28 Jan 2025 23:46:03 +0000 https://swinerton.com/?post_type=project&p=31407 The post Fountain Valley School Campus Improvements appeared first on Swinerton.

]]>

Fountain Valley School Campus Improvements

Project Location
Colorado Springs, CO

Owner 
Fountain Valley School

Architect 
Lake | Flato Architects

Market
K-12 Education

Services
General Contracting, Mass Timber Supply & Install

Region
Central

Swinerton Office Location
Denver, Colorado

Keywords
Mass Timber, STEM building, Bell Tower

The post Fountain Valley School Campus Improvements appeared first on Swinerton.

]]>
DSST Cedar Middle and High School https://swinerton.com/project/dsst-cedar-middle-and-high-school/ Tue, 28 Jan 2025 23:36:27 +0000 https://swinerton.com/?post_type=project&p=31394 The post DSST Cedar Middle and High School appeared first on Swinerton.

]]>

DSST Cedar Middle and High School

Project Location
Denver, CO

Owner 
Denver Public Schools

Architect 
Eidos Architect

Market
K-12 Education

Services
General Contracting

Region
Central

Swinerton Office Location
Denver, Colorado

Keywords
Gymnasium/Athletic Courts, Integrated Structure

The post DSST Cedar Middle and High School appeared first on Swinerton.

]]>
Russell Elementary School https://swinerton.com/project/russell-elementary-school/ Wed, 11 Dec 2024 21:53:49 +0000 https://swinerton.com/?post_type=project&p=30730 The post Russell Elementary School appeared first on Swinerton.

]]>

Russell Elementary School

Project Location
Marietta, GA

Owner 
Cobb County School District

Architect 
Jordan & Skala Engineers, Inc.

Market
K-12 Education

Services
General Contracting

Region
Southeast

Swinerton Office Location
Atlanta, Georgia

Keywords
Self-Perform, Education, Phasing, Occupied Space


Construction is currently underway to enhance the infrastructure at Russell Elementary in Smyrna, Ga., a school originally built in 1961 and has undergone multiple renovations and additions. As general contractor for the $1.8 million phased project, Swinerton is currently overseeing the completion of several structural improvements including removal and replacement of 15 rooftop units, five ductless split systems, four exhaust fans, a kitchen ventilation system, and all associated air distribution ductwork; installation of an updated ANSUL® Fire Suppression system along with an upgraded hood in order to decrease the risk of grease fires; upgrade of eight windows, primarily in the kitchen; and replacement of  72,000 square feet of ceiling tile throughout the school. Work will be strategically scheduled during school holiday weeks and short working windows to ensure minimal disruption to the occupied school. The team will plan materials and labor to optimize productivity during these restricted hours, with a concentrated effort during summer break for the more extensive portions of the work. Careful consideration will be made to ensure spaces are fully usable after each segment of work.

The post Russell Elementary School appeared first on Swinerton.

]]>
Harrison High School https://swinerton.com/project/harrison-high-school/ Wed, 11 Dec 2024 21:27:47 +0000 https://swinerton.com/?post_type=project&p=30726 The post Harrison High School appeared first on Swinerton.

]]>

Harrison High School

Project Location
Kennesaw, GA

Owner 
Cobb County School District

Architect 
SSOE Group

Market
K-12 Education

Services

Region
Southeast

Swinerton Office Location
Atlanta, Georgia

Keywords
Self-Perform, Education, Phasing, Occupied Space


At Harrison High School in Kennesaw, Ga., a school originally built in 1991, Swinerton serves as general contractor for the $15.4 million infrastructure upgrades and renovation. The project involves the replacement or installation of over 200 pieces of equipment throughout the school. The structural scope includes conversion of the former home economics room to a new general classroom; upgrades to four restrooms with new fixtures, ADA railings, accessories and paint; replacement of two roof sections; upgrades to 14 rooftop HVAC units; and replacement of the air handler unit. Additionally, a new emergency responder radio repeater system will be installed to enhance emergency communications by improving first responders’ handheld radio signal strength. Swinerton expects to leverage its self-perform expertise for the installation of door frames, hardware and acoustic ceiling tiles. To minimize disruption to the occupied school, work will be strategically scheduled during holiday breaks and short windows of time, with a concentrated effort over two summer breaks for larger tasks. Careful planning ensures all spaces are fully functional after each phase. Extensive preplanning, regular plan reviews, and close collaboration with trade partners will be critical to the success of the project.

The post Harrison High School appeared first on Swinerton.

]]>
Phoenix Montessori Academy https://swinerton.com/project/phoenix-montessori-academy/ Wed, 11 Dec 2024 19:13:03 +0000 https://swinerton.com/?post_type=project&p=30875 The post Phoenix Montessori Academy appeared first on Swinerton.

]]>

Phoenix Montessori Academy

Project Location
Huntersville, NC

Owner 
HighMark School Development

Architect 
Wolfe Architecture

Market
K-12 Education

Services
General Contracting

Region
Southeast

Swinerton Office Location
Charlotte, North Carolina

Keywords
Education, Ground Up, Design Build


Swinerton is providing general contracting services for the construction of Phoenix Montessori Academy’s new campus, approximately doubling the size of the current campus. The new 38,000-square-foot building features a wood-frame with an Exterior Insulation and Finish System (EIFS) and is designed to minimize thermal energy loss while allowing builders flexibility in design and exterior finishes. The school can accommodate approximately 450 students from toddler to 12th grade. The building includes 18 classrooms, two toddler rooms for ages 18 months to three years old, an art room, science room, warming kitchen and gymnasium with a full-sized basketball court to accommodate the school’s growing sports program. As general contractor, Swinerton is providing ground-up construction services that include pre- and post-construction site work and design build planning from preconstruction to final product. A parking lot along with landscaping that includes tree plantings, concludes the construction scope. Wolfe Architecture designed the education facility, incorporating nods to the phoenix from the signature red color to lines crossing the building and roofline simulating wings.

The post Phoenix Montessori Academy appeared first on Swinerton.

]]>
Melmark Carolinas https://swinerton.com/project/melmark-carolinas/ Wed, 14 Aug 2024 19:05:13 +0000 https://swinerton.com/?post_type=project&p=28992 The post Melmark Carolinas appeared first on Swinerton.

]]>

Melmark Carolinas

Project Location
Charlotte, NC

Owner 
Melmark

Architect 
Ossa Studio

Market
K-12 Education

Services
Construction Management, General Contracting

Region
Southeast

Swinerton Office Location
Charlotte, North Carolina

Keywords
Education, Tenant Improvement


Swinerton provided general contracting services for the conversion of a single-story, multi-tenant office building into a new school. The school features 14 classrooms, clinical support spaces, offices, a library, and restrooms. The renovation included a new lunchroom and assembly room to facilitate student development and interaction. Swinerton worked closely with the design team to maintain the existing building elements, including roofing, building envelope, fire and life safety, electrical systems, and HVAC systems.

Swinerton collaborated with the school administration to understand the student needs and provide expertise in regulatory compliance and accessibility, tailoring the space for to diverse student needs. The new school allows Melmark Carolinas to continue supporting students who require specialized special education in a clinically sophisticated environment.

The post Melmark Carolinas appeared first on Swinerton.

]]>
Denver Public Schools Responsive Arts & STEAM Academy (RASA) https://swinerton.com/project/denver-public-schools-responsive-arts-steam-academy-rasa/ Mon, 22 Jul 2024 20:45:11 +0000 https://swinerton.com/?post_type=project&p=28405 The post Denver Public Schools Responsive Arts & STEAM Academy (RASA) appeared first on Swinerton.

]]>

Denver Public Schools Responsive Arts & STEAM Academy (RASA)

Project Location
Denver, CO

Owner 
Denver Public Schools

Architect 
DLR Group

Market
K-12 Education

Services
General Contracting

Region
Central

Swinerton Office Location
Denver, Colorado

Keywords
Education, Mass Timber


Swinerton provided general contracting services for the construction of a new two-story pre-kindergarten through fifth grade school, and once opened for the community, immediately started building an attached addition for a middle school wing.

The project pushes the envelope in terms of sustainability, as it is the first all-electric school for the district and one of the first all-electric school in Colorado using mass timber construction.

The new elementary school houses classrooms, inquiry zones, a full-service kitchen, a theatrical stage, art rooms, teacher collaboration spaces, and a gymnasium. The building structure uses a combination of a pre-cast concrete exterior, structural steel framing, and mass-timber in the commons and gymnasium. The campus is designed to accommodate future expansions for additional student capacity. Sitework includes new playfields, playgrounds, a parking lot, hardscaping, and landscaping.

The post Denver Public Schools Responsive Arts & STEAM Academy (RASA) appeared first on Swinerton.

]]>
Columbine High School Upgrades and Additions https://swinerton.com/project/columbine-high-school-upgrades-and-additions/ Mon, 22 Jul 2024 20:37:32 +0000 https://swinerton.com/?post_type=project&p=28398 The post Columbine High School Upgrades and Additions appeared first on Swinerton.

]]>

Columbine High School Upgrades and Additions

Project Location
Littleton, CO

Owner 
Jefferson County School District

Architect 
Eidos Architects

Market
K-12 Education

Services
General Contracting

Region
Central

Swinerton Office Location
Denver, Colorado

Keywords
Tenant Improvement, Demolition, Infrastructure


Swinerton provided general contracting services for the campuswide modernization of the high school. The multi-phase project consisted of a 254,000-square-foot renovation and the construction of a new 25,000-square-foot auxiliary gymnasium.

Phase 1 was completed during Spring and Summer 2020 when students were out of school. Nearly every classroom was modernized, including the incorporation of school colors and finishes to give the entire building a cohesive modern look. The scope included a locker room demolition/buildout, flooring demolition/replacement, and new interior finishes within public spaces.

Phase 2 consisted of the construction of a new auxiliary gym and a new main entrance. Work included site preparation, relocation of the existing storm and sewer systems, installation of new site utilities, and upgrades to the south parking lot.

Phase 3 consisted of the demolition and construction of a new large canopy at the school’s main entrance. The canopy provides shade for seating and socializing. Enhancements were also made to the front office and a new secured vestibule was added to provide state-of-the-art monitoring capabilities for the office staff and school security.

The post Columbine High School Upgrades and Additions appeared first on Swinerton.

]]>
Milpitas High School Performing Arts Center https://swinerton.com/project/milpitas-high-school-performing-arts-center/ Sat, 20 Apr 2024 00:10:36 +0000 https://swinerton.com/?post_type=project&p=26637 The post Milpitas High School Performing Arts Center appeared first on Swinerton.

]]>

Milpitas High School Performing Arts Center

Project Location
Milpitas, CA

Owner 
Milpitas Unified School District

Architect 
LPA, Inc.

Market
K-12 Education

Services
Concrete, General Contracting, Self-Perform

Region
Northern California

Swinerton Office Location
Santa Clara, California

Keywords
Design-Bid-Build, Steel Frame Construction, Occupied Campus, 554-Seat Theater

The post Milpitas High School Performing Arts Center appeared first on Swinerton.

]]>
Folsom Middle School Modernization https://swinerton.com/project/folsom-middle-school-modernization/ Fri, 19 Apr 2024 23:56:39 +0000 https://swinerton.com/?post_type=project&p=26628 The post Folsom Middle School Modernization appeared first on Swinerton.

]]>

Folsom Middle School Modernization

Project Location
Folsom, CA

Owner 
Folsom Cordova Unified School District

Architect 
HED

Market
K-12 Education

Services
General Contracting

Region
Northern California

Swinerton Office Location
Sacramento, California

Keywords

Lease-leaseback, Occupied campus, Two-story Classroom building renovation, HVAC replacement, ADA upgrades, design and construction administration, conversion of hallway into new band classroom, new physical education classroom, new drop-off/pick up lane

The post Folsom Middle School Modernization appeared first on Swinerton.

]]>